Every Smart Export Guarantee tariff
All 50 SEG tariffs Ofgem recorded for the scheme year, with the rate, whether it is tied to taking your import from the same supplier, and what makes a variable rate move. As a file, not a lead-generation form.
Fifty tariffs, as published, as a file.
Supplier, legal entity, tariff name, rate, tied or untied, rate type, what makes a variable rate move, and the dates it ran. Open Government Licence, so you can use it for anything.
Download
UK Smart Export Guarantee export tariffs
50 tariffs — supplier, legal entity, tariff, tied or untied, rate in pence per kWh, rate type, variable mechanism, start and end dates, origin and the date we last verified the row.
Download the CSV · 8 kB · Open Government Licence v3.0
Credit as: Contains public sector information licensed under the Open Government Licence v3.0. Compiled by solar.org.uk from Ofgem’s Smart Export Guarantee Annual Report.
What it shows
Baseline figures as Ofgem published them for the scheme year named. Not current quotes — check the supplier’s own terms before switching.
The spread is still the story, and it has changed shape. Among tariffs open to anyone the best rate is six times the worst — it was twelve times when Ofgem published, because the best open rate has halved. Switching still costs nothing but the paperwork, so it is still the first thing to do; it just moves less than it used to.
The rates above 6p are all conditional, and the file now says how: import-tied means you
must buy your electricity from that supplier, and install-tied means they must have
installed your system.
Columns
| Column | What it is |
|---|---|
supplier | The trading name |
supplier_legal_entity | The licensed entity, where it differs — some suppliers hold several |
tariff | The tariff name as Ofgem records it |
access | open, import-tied, install-tied or unclear — see below |
segment | business for tariffs a household cannot take |
rate_p_per_kwh | Rate in pence per kWh |
rate_type | fixed or variable |
variable_mechanism | Ofgem’s own annotation: supplier review or external index |
started, ended | Dates the tariff ran. ended is empty where it was still offered |
origin | ofgem-annual for a baseline row, verified-page for one read from the supplier |
verified | The date the row was last checked |
source_url | Where a verified row was read from |
note | The supplier’s own condition, where there is one |
The access column is the useful one
open means anyone may take it, whoever supplies their import.
import-tied means it requires that supplier’s own electricity supply.
install-tied means it requires that supplier to have installed your system. This
cannot be satisfied retrospectively, and it is where the highest advertised rates in the
market now sit. A rate of 15p to 20p that reads like a market price is, for anyone whose
panels are already up, not a price they can pay.
unclear means the supplier’s page does not say plainly. We treat those as not open rather
than assume, because telling someone a tariff is available when it is not costs them a
wasted switch.
Read the origin column
This matters more than any single rate.
A row with origin ofgem-annual is accurate as Ofgem published it for the scheme year
named in the file header, and is explicitly not a current quote. Rows checked against a
supplier’s own current terms carry a different origin and the date of that check.
We label it this way rather than quietly presenting everything as live, because a tariff table that looks current and is not is worse than one that admits its age.
How it was made
scripts/data/build-seg-baseline.py reads Ofgem’s figures into data/seg-tariffs.yaml;
scripts/data/build-downloads.py emits the CSV. A monitor watches Ofgem’s page for change
and tells a person to go and read it — it does not parse a number and publish it under our
name. A monitor that says “this page changed on Tuesday” costs ten minutes of someone’s
attention and cannot be wrong about anything; a scraper that mis-parses a table publishes a
wrong number with our byline on it. See how we work.
Sources
- Smart Export Guarantee Annual Report — SEG Year 5 Figure 2.1 (untied export tariffs) and Figure 2.2 (tied export tariffs), for the scheme year 1 April 2024 to 31 March 2025.
Contains public sector information licensed under the Open Government Licence v3.0.
Sorry to hear that. What was the problem?