Every Smart Export Guarantee tariff

All 50 SEG tariffs Ofgem recorded for the scheme year, with the rate, whether it is tied to taking your import from the same supplier, and what makes a variable rate move. As a file, not a lead-generation form.

Fifty tariffs, as published, as a file.

Supplier, legal entity, tariff name, rate, tied or untied, rate type, what makes a variable rate move, and the dates it ran. Open Government Licence, so you can use it for anything.

Download

UK Smart Export Guarantee export tariffs

50 tariffs — supplier, legal entity, tariff, tied or untied, rate in pence per kWh, rate type, variable mechanism, start and end dates, origin and the date we last verified the row.

Download the CSV · 8 kB · Open Government Licence v3.0

Credit as: Contains public sector information licensed under the Open Government Licence v3.0. Compiled by solar.org.uk from Ofgem’s Smart Export Guarantee Annual Report.

What it shows

Open untied SEG export ratesAll 19 tariffs open to anyone, whoever supplies your import.
0p5p10pE.ON Next — Next Export Business v18.5pOctopus — Agile Outgoing Octopus May 20198pOctopus — Agile Outgoing Octopus February8pScottish Power — SmartGen6pE.ON Next — Next Flex Export v16pPozitive Energy — SEG15pBritish Gas — Export and Earn Flex4.71pSo Energy — So Export Flex – Export4.5pOctopus — Octopus Outgoing Smart Export…4.1pOctopus — Octopus Outgoing Smart Export…4.1pOctopus — Affect Smart Export Guarantee…4.1pOctopus — Co-op Smart Export Guarantee…4.1pOctopus — My London Smart Export Guarantee…4.1pOVO — SEG4pEDF — SEG Export Variable3pOctopus — Octopus Business SEG 12M Fixed…3pUtilita — Smart Export Guarantee3pUtility Warehouse — UW Smart Export…2pE (Gas & Electricity) — E SEG January2020…1p

Baseline figures as Ofgem published them for the scheme year named. Not current quotes — check the supplier’s own terms before switching.

pence per kWh. Source: Ofgem, Smart Export Guarantee Annual Report — SEG Year 5, 1 April 2024 to 31 March 2025 · OGL v3.0. The figures · download the data.

The spread is still the story, and it has changed shape. Among tariffs open to anyone the best rate is six times the worst — it was twelve times when Ofgem published, because the best open rate has halved. Switching still costs nothing but the paperwork, so it is still the first thing to do; it just moves less than it used to.

The rates above 6p are all conditional, and the file now says how: import-tied means you must buy your electricity from that supplier, and install-tied means they must have installed your system.

Columns

ColumnWhat it is
supplierThe trading name
supplier_legal_entityThe licensed entity, where it differs — some suppliers hold several
tariffThe tariff name as Ofgem records it
accessopen, import-tied, install-tied or unclear — see below
segmentbusiness for tariffs a household cannot take
rate_p_per_kwhRate in pence per kWh
rate_typefixed or variable
variable_mechanismOfgem’s own annotation: supplier review or external index
started, endedDates the tariff ran. ended is empty where it was still offered
originofgem-annual for a baseline row, verified-page for one read from the supplier
verifiedThe date the row was last checked
source_urlWhere a verified row was read from
noteThe supplier’s own condition, where there is one

The access column is the useful one

open means anyone may take it, whoever supplies their import.

import-tied means it requires that supplier’s own electricity supply.

install-tied means it requires that supplier to have installed your system. This cannot be satisfied retrospectively, and it is where the highest advertised rates in the market now sit. A rate of 15p to 20p that reads like a market price is, for anyone whose panels are already up, not a price they can pay.

unclear means the supplier’s page does not say plainly. We treat those as not open rather than assume, because telling someone a tariff is available when it is not costs them a wasted switch.

Read the origin column

This matters more than any single rate.

A row with origin ofgem-annual is accurate as Ofgem published it for the scheme year named in the file header, and is explicitly not a current quote. Rows checked against a supplier’s own current terms carry a different origin and the date of that check.

We label it this way rather than quietly presenting everything as live, because a tariff table that looks current and is not is worse than one that admits its age.

How it was made

scripts/data/build-seg-baseline.py reads Ofgem’s figures into data/seg-tariffs.yaml; scripts/data/build-downloads.py emits the CSV. A monitor watches Ofgem’s page for change and tells a person to go and read it — it does not parse a number and publish it under our name. A monitor that says “this page changed on Tuesday” costs ten minutes of someone’s attention and cannot be wrong about anything; a scraper that mis-parses a table publishes a wrong number with our byline on it. See how we work.

Sources

  1. Smart Export Guarantee Annual Report — SEG Year 5 Ofgem · Accessed 15 August 2026 · OGL v3.0 Figure 2.1 (untied export tariffs) and Figure 2.2 (tied export tariffs), for the scheme year 1 April 2024 to 31 March 2025.

Contains public sector information licensed under the Open Government Licence v3.0.

Last verified: How we research this Suggest a correction
Was this page helpful?
Sign up to the newsletter